Case 1: Waste Recycling Network Optimization
This is a multi-objective linear programming problem that requires balancing transportation cost minimization with recycling maximization.
Decision Variables:
Let xijxij = kilotonnes transported from sector ii to recycling site jj
Where: i=1,2,...,10i=1,2,...,10 (sectors), j=1,2,...,5j=1,2,...,5 (recycling sites)
Mathematical Formulation:
Objective Function:
Minimize: Z=2×(−Recycling Amount)+1×(Transportation Cost)Z=2×(−Recycling Amount)+1×(Transportation Cost)
More precisely:
Minimize Z=2×(−∑i=110∑j=15Efficiencyj×xij)+1×(65.90×∑i=110∑j=15Distanceij×xij)Minimize Z=2×(−i=1∑10j=1∑5Efficiencyj×xij)+1×(65.90×i=1∑10j=1∑5Distanceij×xij)
Subject to:
- Supply constraints (all garbage from each sector must be collected):
∑j=15xij=Demandifor i=1,...,10j=1∑5xij=Demandifor i=1,...,10
- Capacity constraints (sites cannot exceed capacity):
∑i=110xij≤Capacityjfor j=1,...,5i=1∑10xij≤Capacityjfor j=1,...,5
- Non-negativity:
xij≥0for all i,jxij≥0for all i,j
Recommended Solution Approach:
Given the 50 decision variables and 15 constraints, this requires linear programming software (Excel Solver, Python's PuLP, or specialized OR software).
Key Insights:
- Site 5 has the highest efficiency (60%) but is far from most sectors
- Site 4 has good efficiency (43%) but limited capacity (37 kt)
- Sites near sectors (e.g., Site 1 for Sectors 1-5) have lower transport costs but lower efficiency
The optimal solution will prioritize sending garbage to high-efficiency sites despite higher transport costs, since recycling maximization is weighted twice as important.
Case 2: Brown Onion Inventory Management
Given Data Summary:
- Annual demand D=41,250D=41,250 kg
- Unit cost C=$1.42/kgC=$1.42/kg
- Holding cost rate h=23%h=23%
- Ordering cost S=$48.30S=$48.30
- In-transit holding rate it=11%it=11%
- Freight rate f=$0.08/kgf=$0.08/kg
- Freight-related charges F=$82/shipmentF=$82/shipment
- Lead time L=1+3=4L=1+3=4 days
- Working days/year = 364
Calculations:
a. Economic Order Quantity (EOQ):
Q∗=2DShC=2×41,250×48.300.23×1.42=3,984,7500.3266=12,202,426≈3,493 kgQ∗=hC2DS=0.23×1.422×41,250×48.30=0.32663,984,750=12,202,426≈3,493 kg
b. Total Purchasing Cost:
=D×C=41,250×1.42=$58,575=D×C=41,250×1.42=$58,575
c. Total Ordering Cost:
=DQ∗×S=41,2503,493×48.30≈11.81×48.30≈$570.42=Q∗D×S=3,49341,250×48.30≈11.81×48.30≈$570.42
d. Total Inventory Holding Cost:
=Q∗2×h×C=3,4932×0.23×1.42≈1,746.5×0.3266≈$570.42=2Q∗×h×C=23,493×0.23×1.42≈1,746.5×0.3266≈$570.42
e. Total Transportation Cost (by weight):
=D×f=41,250×0.08=$3,300=D×f=41,250×0.08=$3,300
f. Total Freight-related Cost (by shipment):
=DQ∗×F=11.81×82≈$968.42=Q∗D×F=11.81×82≈$968.42
g. Total In-transit Holding Cost:
=D×C×it×Transit TimeWorking Days=58,575×0.11×3364≈6,443.25×0.00824≈$53.09=D×C×it×Working DaysTransit Time=58,575×0.11×3643≈6,443.25×0.00824≈$53.09
h. Total Cost for Inventory Plan:
=58,575+570.42+570.42+3,300+968.42+53.09=$64,037.35=58,575+570.42+570.42+3,300+968.42+53.09=$64,037.35
i. Number of Orders:
=DQ∗=41,2503,493≈11.81 orders/year=Q∗D=3,49341,250≈11.81 orders/year
j. Ordering Point (Reorder Point):
Daily demand = 41,250/364≈113.3241,250/364≈113.32 kg/day
ROP=Daily Demand×Lead Time=113.32×4≈453.3 kgROP=Daily Demand×Lead Time=113.32×4≈453.3 kg
k. Profit from Inventory Plan:
Revenue = 41,250×3.85=$158,812.5041,250×3.85=$158,812.50
Profit=158,812.50−64,037.35=$94,775.15Profit=158,812.50−64,037.35=$94,775.15
Case 3: Printer Selection Using AHP
Step 1: Normalize Pairwise Matrices
Criteria Comparison Matrix (3×3):
[131/31/311/2321]11/333121/31/21
Sum of columns: [4.333, 6, 1.833]
Normalized matrix:
[0.2310.5000.1820.0770.1670.2730.6920.3330.545]0.2310.0770.6920.5000.1670.3330.1820.2730.545
Criteria weights (row averages):
- Price: (0.231+0.500+0.182)/3=0.304(0.231+0.500+0.182)/3=0.304
- Ink Cost: (0.077+0.167+0.273)/3=0.172(0.077+0.167+0.273)/3=0.172
- Printing Quality: (0.692+0.333+0.545)/3=0.524(0.692+0.333+0.545)/3=0.524
Step 2: Normalize Alternative Matrices
Price Comparison (Epson, Canon, HP):
Matrix:
[10.50.333210.76931.31]1230.511.30.3330.7691
Column sums: [6, 2.8, 2.102]
Normalized:
[0.1670.1790.1580.3330.3570.3660.5000.4640.476]0.1670.3330.5000.1790.3570.4640.1580.3660.476
Weights: E=0.168, C=0.352, H=0.480
Ink Cost Comparison:
Matrix:
[10.250.33341230.51]1430.2510.50.33321
Column sums: [8, 1.75, 3.333]
Normalized:
[0.1250.1430.1000.5000.5710.6000.3750.2860.300]0.1250.5000.3750.1430.5710.2860.1000.6000.300
Weights: E=0.123, C=0.557, H=0.320
Printing Quality Comparison:
Matrix:
[1340.333120.250.51]10.3330.25310.5421
Column sums: [1.583, 4.5, 7]
Normalized:
[0.6320.6670.5710.2110.2220.2860.1580.1110.143]0.6320.2110.1580.6670.2220.1110.5710.2860.143
Weights: E=0.623, C=0.240, H=0.137
Step 3: Final Weighted Scores
Printer
Price (0.304)
Ink Cost (0.172)
Quality (0.524)
Total Score
Epson
0.168 × 0.304 = 0.0511
0.123 × 0.172 = 0.0212
0.623 × 0.524 = 0.3265
0.3988
Canon
0.352 × 0.304 = 0.1070
0.557 × 0.172 = 0.0958
0.240 × 0.524 = 0.1258
0.3286
HP
0.480 × 0.304 = 0.1459
0.320 × 0.172 = 0.0550
0.137 × 0.524 = 0.0718
0.2727
Recommendation: Epson EcoTank Photo ET-8500 (score: 0.3988)
Case 4: EV Car Selection Using Weighted Sum Model
Normalization and Scoring:
For minimization criteria (Price, Servicing, Charge Time):
Normalized Score=Min ValueActual ValueNormalized Score=Actual ValueMin Value
For maximization criteria (Power, Drive, Range, Boot):
Normalized Score=Actual ValueMax ValueNormalized Score=Max ValueActual Value
Calculations:
Criteria
Weight
Polestar 4
Kia EV6
BYD Sealion 7
Tesla Model 3
Price (Min)
7
87,903/87,903=1.000
81,289/87,903=0.925
69,255/87,903=0.788
75,890/87,903=0.863
Servicing (Min)
3
750/750=1.000
1,382/750=0.543
945/750=0.794
1,125/750=0.667
Charge Time (Min)
4
30/18=0.600
18/18=1.000
450/18=0.040
31/18=0.581
Power (Max)
5
200/390=0.513
168/390=0.431
390/390=1.000
366/390=0.938
Drive (Max)
4
2/4=0.500
2/4=0.500
4/4=1.000
4/4=1.000
Range (Max)
6
620/629=0.986
528/629=0.839
456/629=0.725
629/629=1.000
Boot Space (Max)
5
526/594=0.885
490/594=0.825
500/594=0.842
594/594=1.000
Weighted Scores:
- Polestar 4:
(7×1.000)+(3×1.000)+(4×0.600)+(5×0.513)+(4×0.500)+(6×0.986)+(5×0.885)(7×1.000)+(3×1.000)+(4×0.600)+(5×0.513)+(4×0.500)+(6×0.986)+(5×0.885)
=7.000+3.000+2.400+2.565+2.000+5.916+4.425=27.306=7.000+3.000+2.400+2.565+2.000+5.916+4.425=27.306 - Kia EV6:
(7×0.925)+(3×0.543)+(4×1.000)+(5×0.431)+(4×0.500)+(6×0.839)+(5×0.825)(7×0.925)+(3×0.543)+(4×1.000)+(5×0.431)+(4×0.500)+(6×0.839)+(5×0.825)
=6.475+1.629+4.000+2.155+2.000+5.034+4.125=25.418=6.475+1.629+4.000+2.155+2.000+5.034+4.125=25.418 - BYD Sealion 7:
(7×0.788)+(3×0.794)+(4×0.040)+(5×1.000)+(4×1.000)+(6×0.725)+(5×0.842)(7×0.788)+(3×0.794)+(4×0.040)+(5×1.000)+(4×1.000)+(6×0.725)+(5×0.842)
=5.516+2.382+0.160+5.000+4.000+4.350+4.210=25.618=5.516+2.382+0.160+5.000+4.000+4.350+4.210=25.618 - Tesla Model 3:
(7×0.863)+(3×0.667)+(4×0.581)+(5×0.938)+(4×1.000)+(6×1.000)+(5×1.000)(7×0.863)+(3×0.667)+(4×0.581)+(5×0.938)+(4×1.000)+(6×1.000)+(5×1.000)
=6.041+2.001+2.324+4.690+4.000+6.000+5.000=30.056=6.041+2.001+2.324+4.690+4.000+6.000+5.000=30.056
Recommendation: Tesla Model 3 (score: 30.056)
Summary of Recommendations:
- Case 1: Requires linear programming solution prioritizing high-efficiency recycling sites
- Case 2: EOQ = 3,493 kg, Total Cost = $64,037.35, Profit = $94,775.15
- Case 3: Select Epson EcoTank Photo ET-8500 (AHP score: 0.3988)
- Case 4: Select Tesla Model 3 (weighted score: 30.056)
For Case 1, I recommend using optimization software to find the exact distribution xijxij. For the other cases, all calculations are complete and ready for implementation.